Our Installation Process

Most flake Jobs take 1-2 days depending on condition & square footage of the space.

Surface preparation step with a concrete grinder opening up the pores of concrete to ensure a strong bond.
Close-up of a hand using a trowel to repair a crack in a concrete surface with epoxy filler, under a section labeled 'Patching & Repairs'.
Instructional graphic for epoxy base coat application, showing workers spreading epoxy on a surface with a trowel.
Person wearing blue gloves broadcasting dry flakes into wet epoxy to create a patterned coverage, with an instructional header titled 'Flake Broadcasting'
Applying a clear polyaspartic topcoat to a floor with a squeegee, part of a flooring application process.

 

Our professional installation team is ready to transform your space with a beautiful, durable epoxy floor.

Ready to Get Started ?